Impact of viscous fingering and permeability heterogeneity on fluid mixing in porous media

[5] C. Nicolaides, B. Jha, L. Cueto-Felgueroso, and R. Juanes. Impact of viscous fingering and permeability heterogeneity on fluid mixing in porous media. Water ResourcesResearch51, doi:10.1002/2014WR015811, 2015.

Link to document. pdf_peq

Regime shifts in bistable water-stressed ecosystems due toamplification of stochastic rainfall patterns

[4] L. Cueto-Felgueroso, M. Dentz and R. Juanes. Regime shifts in bistable water-stressed ecosystems due toamplification of stochastic rainfall patterns. Physical Review E 91: 052148, 2015.

Link to document. pdf_peq

Thin films in partial wetting: internal selection of contact-line dynamics

[3] A. Alizadeh Pahlavan, L. Cueto-Felgueroso, G. H. McKinley, and R. Juanes. Thin films in partial wetting: internal selection of contact-line dynamics. Physical Review Letters. Accepted, in press.

png_peqLink to document MIT spotlight.
Link to MIT news story.www_peq

Self-organization of network dynamics into local quantized states

[2] C. Nicolaides, R. Juanesand L. Cueto-Felgueroso. Self-organization of network dynamics into local quantized states.Submitted for publication.

Fingering instabilities during water infiltration in soil suggest higher resilience of water-stressed ecosystems

[1] L. Cueto-Felgueroso, H. Gomez, and R. Juanes. Fingering instabilities during water infiltration in soil suggest higher resilience of water-stressed ecosystems. Submitted for publication.

Optimal short-term operation schedule of a hydropower plant in a competitive electricity market.

[P.11] Pérez-Díaz, JI, Wilhelmi, JR and Arévalo Muñoz, L, Optimal short-term operation schedule of a hydropower plant in a competitive electricity market,Energy Conversion and Management, vol. 51 (12), pp. 2955-2966. 2010.

Short-term operation scheduling of a hydropower plant in the day-ahead electricity market

[P.10] Pérez-Díaz, JI, Wilhelmi, JR and Sánchez-Fernández, JA, Short-term operation scheduling of a hydropower plant in the day-ahead electricity market,Electric Power Systems Research, vol. 80 (12), pp. 1535-1542, 2010.

Assessment of the economic impact of environmental constraints on short-term hydropower plant operation

[P.9] Pérez-Díaz, JI and Wilhelmi, JR, Assessment of the economic impact of environmental constraints on short-term hydropower plant operation,Energy Policy, vol. 38 (12), pp. 7960-7970, 2010.

Dynamic response of hydro power plants to load variations for providing secondary regulation reserves considering elastic water column effects

[P.8] Pérez-Díaz, JI, Wilhelmi, JR, Galaso, I, Fraile-Ardanuy, J, Sanchez, JA, Castañeda, O and Sarasua, JI, Dynamic response of hydro power plants to load variations for providing secondary regulation reserves considering elastic water column effects, PrzegladElektrotechniczny (Electrical Review), vol. 88, no. 1a, pp. 159-163, 2012.

Contribution of re-regulation reservoirs considering pumping capability to environmentally friendly hydropower operation

[P.7] Pérez-Díaz, JI, Wilhelmi, JR, García, D, Millán, R and Guisández, I, Contribution of re-regulation reservoirs considering pumping capability to environmentally friendly hydropower operation, Energy, vol. 48 (1), pp. 144-152, 2012.